• Pre-Inspection Questionnaire

  • 3001. Required frequency of Inspection of Cargo Tanks

  • 3002. Required frequency of Inspection of Ballast Tanks

  • 3003. Required frequency of Inspection of Void Spaces

  • Examples of Date Picker, Single Select Dropdown and Conditional fields

  • 1. Certification

  • Examples of Multi Select Dropdown

  • 4. Has an unannounced Remote Navigational Assessment, which included a review of VDR & ECDIS data, been conducted by an independent contractor or specialist company representative during the preceding twelve months?

  • Examples of Date entry Grids & Free Text

  • 2. Please specify the last three Port State Control Inspections.

  • 2. Minimum dynamic under keel clearance

  • Should be Empty: